Advertisement

AUSTRALIAN NAVY: Dockwise delivers carrier

The Dockwise heavy-lift ship Blue Marlin has safely arrived in Port Phillip Bay with the hull of the future HMAS Canberra, after a hazardous 12,000nm voyage from Spain. The operation to release and float off the helicopter landing ship was delayed for ten days by bad weather after which it was towed to the BAE Systems shipyard at Williamstown for outfitting. The second hull, Adelaide, is scheduled to be transported in early 2014.

At 230m in length, 32m wide and displacing 27,500 tonnes fully loaded, the Canberra class LHDs will become the largest warships ever built for the Royal Australian Navy. Designed primarily for amphibious operations and the strategic projection of land forces, they are to be jointly crewed by the Navy, Army and Air Force.

The flight deck will have six landing spots for the operation of NH90, S-70 Blackhawk or Tiger attack helicopters, enough hangar space for up to 11NH‑90 aircraft.

Ships Montly - January 2024

ZIM shipping continues to expand fleet

A substantial newbuilding programme along with recent vessel deliveries has propelled Israeli-based ZIM Integrated Shipping Services ahead of Taiwan’s Yang Ming in the liner...
Advertisement

Related articles

ZIM shipping continues to expand fleet

A substantial newbuilding programme along with recent vessel deliveries has propelled Israeli-based ZIM Integrated Shipping Services ahead of...

Stena Line acquires shares in Africa Morocco Link to expand outside of Europe

Stena Line has entered an agreement to acquire 49 per cent of the shares in Morocco based ferry...

Royal Bodewes selects DMC to supply controls for newbuilds

Damen Marine Components has been contracted by Royal Bodewes to supply steering, control and propulsion equipment for four...

New gas carrier Taebaek Explorer named in South Korea

The naming ceremony for the gas carrier Taebaek Explorer was held at the Hyundai Samho Heavy Industries Co...