Advertisement

Major refit at Damen

On 19 December Damen Shiprepair in Rotterdam redelivered Saga Sapphire after her major refit, including the replacement of the ship’s two sewage plants, a job that involved cutting through the hull.

In addition, the vessel’s freshwater tanks were sand-blasted and repainted, but with around 425 people, including members of the ship’s crew, living on board, arrangements had to be made to supply fresh water and remove grey water. Deck steelwork, lifeboats and davits also received attention, as did piping, electrical and hydraulic systems. The 37,000 ton Saga Sapphire sailed on schedule for her Christmas Canary Islands cruise. WM

Ships Montly - January 2024

ZIM shipping continues to expand fleet

A substantial newbuilding programme along with recent vessel deliveries has propelled Israeli-based ZIM Integrated Shipping Services ahead of Taiwan’s Yang Ming in the liner...
Advertisement

Related articles

ZIM shipping continues to expand fleet

A substantial newbuilding programme along with recent vessel deliveries has propelled Israeli-based ZIM Integrated Shipping Services ahead of...

Stena Line acquires shares in Africa Morocco Link to expand outside of Europe

Stena Line has entered an agreement to acquire 49 per cent of the shares in Morocco based ferry...

Royal Bodewes selects DMC to supply controls for newbuilds

Damen Marine Components has been contracted by Royal Bodewes to supply steering, control and propulsion equipment for four...

New gas carrier Taebaek Explorer named in South Korea

The naming ceremony for the gas carrier Taebaek Explorer was held at the Hyundai Samho Heavy Industries Co...