Advertisement

Jumbo Completes Project for the Arkona Offshore Wind Farm

During January 2018 Jumbo completed their project for the Arkona offshore wind farm (E.ON and Statoil).

The entire project involved the construction of a 385MW offshore wind farm in the German Baltic Sea.

Van Oord contracted Jumbo for the installation of the 60 transition pieces.

The vessel chosen to tackle the job was the MV Fairplayer a DP2 Heavy Lift Crane Vessel suited to the offshore requirements of the Energy Industry worldwide.

Check out the video footage:

https://www.youtube.com/watch?v=E_ESA0t2gwk

Ships Montly - January 2024

Ships Monthly May 2024 issue out now.

The May 2024 issue of Ships Monthly is out now, and is packed with all the usual news and outstanding articles and features. NEWS Waterfront –...
Advertisement

Related articles

Ships Monthly May 2024 issue out now.

The May 2024 issue of Ships Monthly is out now, and is packed with all the usual news...

Damen launches pilot project for circular shipbreaking

Damen Shipyards Group is launching a pilot project in which a small tug will be dismantled at Damen...

INCAT to commence design study for new electric-hybrid ferry with DFDS

On 23 April 2024 Incat Tasmania announced a new partnership with Danish Shipping and Logistics Company DFDS to...

Wan Hai Lines names eco-friendly 3,055 TEU containership trio

Taiwanese shipping company Wan Hai Lines held a naming ceremony on 26 March for three new eco-friendly 3,055...