Advertisement

Wärtsilä engines and exhaust gas cleaning chosen for new cruise ship

The technology group Wärtsilä has been contracted to supply the engines and exhaust gas cleaning systems for a new 104m long exploration cruise vessel.

The ship is being built at the China Merchants Heavy Industry shipyard in China for Sunstone Ships of Miami, USA. There are options for an additional nine vessels.

The contract with Wärtsilä was placed by Ulstein Design and Solutions of Norway, the company responsible for delivering the design and equipment package to the yard. The order was booked in June 2017.

The supply comprises two 6-cylinder Wärtsilä 20 engines fitted with the Wärtsilä NOR exhaust gas cleaning system, and two 8-cylinder Wärtsilä 20 engines.

The Wärtsilä NOR is based on SCR (Selective Catalytic Reduction) technology. The system is compliant with various NOx (Nitrogen Oxides) emission reduction needs, such as the IMO Tier III rules.

The Wärtsilä equipment will be delivered to the yard in January 2018, and the ship is expected to begin operations in September 2019.

Ships Montly - January 2024

Ships Monthly May 2024 issue out now.

The May 2024 issue of Ships Monthly is out now, and is packed with all the usual news and outstanding articles and features. NEWS Waterfront –...
Advertisement

Related articles

Ships Monthly May 2024 issue out now.

The May 2024 issue of Ships Monthly is out now, and is packed with all the usual news...

Damen launches pilot project for circular shipbreaking

Damen Shipyards Group is launching a pilot project in which a small tug will be dismantled at Damen...

INCAT to commence design study for new electric-hybrid ferry with DFDS

On 23 April 2024 Incat Tasmania announced a new partnership with Danish Shipping and Logistics Company DFDS to...

Wan Hai Lines names eco-friendly 3,055 TEU containership trio

Taiwanese shipping company Wan Hai Lines held a naming ceremony on 26 March for three new eco-friendly 3,055...