Advertisement

LR Approval for LNG bunkering vessels

An HMD design for 6,600m3 vessel based on Zeebrugge LNG terminal requirements has received approval in principle (AiP) through Lloyds Register’s Busan Technical Support Office

The design from Hyundai Mipo Dockyard (HMD) for the LNG bunker vessel will be capable of supplying both small scale requirements and the current maximum expected requirements for large ships trading worldwide.

The design incorporates two cylindrical type ‘C’ tanks, reliquefaction plant, a new and sophisticated loading arm and high manoeuvrability for safe operations. The design is available in both single and twin screw with different propeller options.

A video clip for LNG bunkering operation is available at http://www.hmd.co.kr/english/03/01_3_10.php

Chang-hyun Yoon, EVP of HMD Initial Planning Division said: ‘We have invested in developing the wide variety of gas ship design not only to respond quickly to the market demand and but also to lead the market. For this reason, we have prepared three prototype of 6,600m3 (single or twin screw) and 15,000m3 Class Dual Fuelled LNG Bunkering vessels targeting to operate in Zeebrugge small LNG terminal for LNG fuel in order to develop a global market for the LNG bunkering business.’

The 6,600m3 bunkering vessel is designed to have two cylindrical tanks and no-bulbous bow shape while the 15,000m3 has three bi-lobe tanks and bulbous bow.

Both 6,600 m3 and 15,000 m3 bunkering vessels are fully compliant with NOx Tier III at gas mode, and equipped with one set of re-liquefaction plant (1,000 kg/h), gas combustion unit and different combination of thrusters, flap rudder for better sea-keeping ability at rough sea.

Because large scale LNG carriers are not appropriate for short voyages and small LNG terminals, small scale carriers could be considered as an alternative.

The new vessel carries liquefied natural gas (LNG) mainly, and also other liquefied gases such as ethylene, ethane, LPG and chemical cargoes could be transported when there is little demand for LNG cargo as owner’s option.

Ships Montly - January 2024

Damen launches pilot project for circular shipbreaking

Damen Shipyards Group is launching a pilot project in which a small tug will be dismantled at Damen Shiprepair Rotterdam’s Botlek site in a...
Advertisement

Related articles

Damen launches pilot project for circular shipbreaking

Damen Shipyards Group is launching a pilot project in which a small tug will be dismantled at Damen...

INCAT to commence design study for new electric-hybrid ferry with DFDS

On 23 April 2024 Incat Tasmania announced a new partnership with Danish Shipping and Logistics Company DFDS to...

Wan Hai Lines names eco-friendly 3,055 TEU containership trio

Taiwanese shipping company Wan Hai Lines held a naming ceremony on 26 March for three new eco-friendly 3,055...

DNV awards certificates for Fortescue’s dual-fuelled ammonia-powered vessel

On 19 April 2024 classification society DNV presented Australian green technology, energy and metals company Fortescue with class...