Advertisement

Wärtsilä involved with four new LNG fuelled tankers

Wärtsilä, provider of LNG fuel solutions to the marine industry, has been awarded a contract covering four newbuild tanker vessels. 

The ships are to be built at the Avic Dingheng shipyard in China, on behalf of three Swedish owners; Furetank (two vessels), Älvtank, and Thun Tankers, a fully owned subsidiary of Thunbolagen. The vessels will be commercially managed by Furetank Chartering in the Gothia Tanker Alliance.

The ships will fulfil the IMO’s Tier III requirements and will be fuelled primarily by liquefied natural gas (LNG). The scope of Wärtsilä’s supply to this project is extensive.

For each vessel it comprises a nine-cylinder Wärtsilä 34DF dual-fuel main engine, two Wärtsilä Auxpac 20 auxiliary engines, the gas valve unit, a controllable pitch propeller (CPP) compliant with Ice Class 1A, a high performance nozzle, a Wärtsilä Energopac rudder system, a Wärtsilä selective catalytic reduction (SCR) system for the auxiliary engines, 12 Wärtsilä deepwell cargo pumps, and two Wärtsilä deepwell ballast pumps with a frequency control system.

Wärtsilä will also supply the vessels with a gearbox and shaft alternator having ‘take-me-home’ functionality. This provides propulsion power to the auxiliary engine should the main engine be out of operation for any reason, thus allowing the vessel to return safely to port. Delivery of the Wärtsilä equipment is scheduled to commence in spring 2017.

To achieve optimal propulsion efficiency, Wärtsilä utilized its OPTI Design methodology. This uses accurate information via computational fluid dynamics (CFD) analysis to calculate the performance of the propeller, nozzle and rudder, including their interaction with the vessel’s hull, thereby enabling a design that gives a perfect match between the various propulsion elements. 

 The vessels will be built to a design, developed by Swedish ship designer FKAB together with Furetank. They feature a special focus on minimising the impact on the environment, with a close to 50 % reduction in CO2 emissions over similar class vessels built between 2002 and 2012.

Ships Montly - January 2024

Stena Line announces plans to withdraw its Rosslare-Cherbourg service 

Following a strategic route review, Stena Line has announced that from 30 September 2025, the ferry operator intends to withdraw its existing three-day Rosslare-Cherbourg...
Advertisement

Related articles

Stena Line announces plans to withdraw its Rosslare-Cherbourg service 

Following a strategic route review, Stena Line has announced that from 30 September 2025, the ferry operator intends...

Deltamarin wins contract for six ro-pax vessels for Grimaldi Lines

On 24 June 2025 Deltamarin signed a design and engineering contract with China Merchants Jinling Shipyard (Weihai) for...

New boxboat Maersk Namsos

Japan's Imabari Shipbuilding successfully delivered Maersk Namsos, a 2,086 twenty-foot equivalent unit (TEU) containership, on 4 June 2025. This...

ABB wins electrical and automation contract for next generation of Petrobras FPSO vessels

ABB has been awarded a large order by Seatrium, a global provider of marine engineering solutions based in...