Advertisement

SUPPLY VESSEL: Alexey Chirikov heads for the Far East

Alexey Chirikov (7,487gt), the second multifunctional ice-breaking supply vessel (MIBSV) built for Sovcomflot, was christened and handed over at Arctech Helsinki Shipyard on 19 April. She sailed four days later to join sistership Vitus Bering operating in the Sakhalin Sea, where ExxonNeftegas has its production platform, supplying the rig and keeping it free from shifting ice in the extreme winter conditions, with temperatures dropping to minus 40oC and ice nearly 2m thick.

While Vitus Bering was delivered four months ahead of schedule, Alexey Chirikov met her early April date and Arctech has now fulfilled its first contract worth US$200 million with flying colours. Alexey Chirikov’s naming in Helsinki was deemed so important that the President of Finland attended, along with VIPs from Sovcomflot, Arctech and STX Europe.

The MIBSVs can perform a variety of tasks and have identical specifications: they measure 100m by 22m wide, have 22 crew and the main engines power twin azimuth propeller units. JP

Ships Montly - January 2024

New Cunarder Queen Anne makes her debut

Cunard's newest cruise ship, Queen Anne, arrived at her home port of Southampton on 30 April 2024. The 3,000-passenger ship was watched by hundreds...
Advertisement

Related articles

New Cunarder Queen Anne makes her debut

Cunard's newest cruise ship, Queen Anne, arrived at her home port of Southampton on 30 April 2024. The...

X-Press Feeders agree with Europe’s ports to help go green

X-Press Feeders, the world's largest independent common carrier, has signed a memorandum of understanding (MOU) with six prominent...

Paddle steamer Waverley announced as National Flagship of the Year 2024

Waverley, the World’s last seagoing paddle steamer, has been awarded the prestigious status of National Flagship of the...

Chief Operating Officer Fleet appointed at Stena Line

As of 1 May 2024, Dennis Tetzlaff is Stena Line’s new Chief Operating Officer Fleet and part of...