Advertisement

Construction of the next CSOV for BS Offshore starts at Ulstein Verft

On 11 March 2025, the hull of yard number (Yno) 321 for BS Offshore arrived at Ulstein Verft. This marks the beginning of a new phase in the shipbuilding process.

The vessel is designed by Ulstein Design & Solutions AS for ‘walk-to-work’ (W2W) operations, where personnel walks via a motion-compensated gangway from the ship to a wind turbine.

While the hull has been under construction at the CRIST yard in Poland, closely monitored by a site team from Ulstein Verft, the designers and engineers at the various Ulstein companies in Norway and Poland have been working on finalising the detailed drawings for the ship.

The hull arrival at Ulstein Verft marks a new phase, which includes securing, painting, outfitting, piping, equipment installations, electrical work, and system integration.

The vessel is sister to Yno 320, launched at Ulstein Verft on 23 February.

TWIN X-STERN

Like its predecessor, the newbuild is part of the innovative TWIN X-STERN CSOV series, known for its exceptional operational performance and seakeeping abilities.

During the outfitting phase, the vessel will be equipped with advanced technology, including a 3D-compensated crane and a gangway, ensuring safe and efficient personnel and cargo transfer to offshore wind turbine facilities.

The vessel will also have a diesel-electric propulsion system with substantial battery energy storage, significantly reducing the environmental footprint. She is prepared for methanol as a future fuel.

After her delivery in 2025, the vessel will be ready to support the offshore wind sector with modern, high-comfort accommodation for up to 132 crew and clients.

This is Ulstein’s fifth W2W vessel for BS Offshore. All have been designed by Ulstein Design & Solutions AS and constructed at Ulstein Verft.

BS Offshore is a pioneering ship owner, and Ulstein is proud to continue the partnership, contributing to the advancement of sustainable maritime solutions.

The construction of the next CSOV for BS Offshore starts at Ulstein Verft
The construction of the next CSOV for BS Offshore starts at Ulstein Verft t
Ships Montly - January 2024

New boxboat Maersk Namsos

Japan's Imabari Shipbuilding successfully delivered Maersk Namsos, a 2,086 twenty-foot equivalent unit (TEU) containership, on 4 June 2025. This Panama-flagged vessel has a gross tonnage...
Advertisement

Related articles

New boxboat Maersk Namsos

Japan's Imabari Shipbuilding successfully delivered Maersk Namsos, a 2,086 twenty-foot equivalent unit (TEU) containership, on 4 June 2025. This...

ABB wins electrical and automation contract for next generation of Petrobras FPSO vessels

ABB has been awarded a large order by Seatrium, a global provider of marine engineering solutions based in...

Stena Futura successfully completes sea trials in China

Stena Line has announced that Stena Futura, the first of its new hybrid ferries destined for the Irish...

New Ulstein based fibre-optic cable-laying vessel

In June 2025 Megamas Resources announced a ship design contract with Norway-based Ulstein Design & Solutions AS to...