Advertisement

Preserved paddler: Medway Queen returns to the water

On 24 October 2013 the partially-restored paddler Medway Queen was towed out of the dry dock in Bristol, where restoration work has been ongoing, and moored in the Floating Harbour opposite the Albion Dock ready to go to the Medway, where she is to be fitted out at Gillingham Pier. She was towed by the tug Christine down the river to Avonmouth on 31 October, remaining there until 15 November when she left for the Medway, arriving on 18 November.

The rebuild of the 1924-built paddle steamer has been described as ‘a fantastic achievement for British engineering’, and has followed original drawings while adapting traditional techniques to thepresent day. Restoration work on the hull began in Bristol in 2011, with money from a £1.86 million Heritage Lottery Grant. The historicpaddler’s eventful life includes wartime minesweeping and involvement in the Dunkirk Evacuation.

Ships Montly - January 2024

ABB wins electrical and automation contract for next generation of Petrobras FPSO vessels

ABB has been awarded a large order by Seatrium, a global provider of marine engineering solutions based in Singapore, for the supply of electrical...
Advertisement

Related articles

ABB wins electrical and automation contract for next generation of Petrobras FPSO vessels

ABB has been awarded a large order by Seatrium, a global provider of marine engineering solutions based in...

Stena Futura successfully completes sea trials in China

Stena Line has announced that Stena Futura, the first of its new hybrid ferries destined for the Irish...

New Ulstein based fibre-optic cable-laying vessel

In June 2025 Megamas Resources announced a ship design contract with Norway-based Ulstein Design & Solutions AS to...

Ships Monthly July issue out now

SHIPS MONTHLY July  2025 The July 2025 issue of Ships Monthly is out now, and is packed with all...