Advertisement

US Navy: Up against the clock

An internal Pentagon assessment of the state of new advanced technologies on the first of the navy’s new class of aircraft carriers has flagged up concerns over their readiness and reliability. Although still two years away from completion, initial inspections of key systems have highlighted significant performance-related issues that, if unresolved, could render the US$12 billion ship less effective than the previous generation of ship.

Primary among them is the electromagnetic aircraft launch system, which is replacing the conventional steam-powered catapult. The new method of launching aircraftwill use a 100,000hp linear electric motor, with a slide that accelerates along a rail.

It was designed to substantially improve sortie rates but has yet to achieve a satisfactory level of reliability. The operational effectiveness of the new arrestor landing system, advanced dual-band radar system and weapons elevator were also identified as causes for concern in the report.

Ships Montly - January 2024

New boxboat Maersk Namsos

Japan's Imabari Shipbuilding successfully delivered Maersk Namsos, a 2,086 twenty-foot equivalent unit (TEU) containership, on 4 June 2025. This Panama-flagged vessel has a gross tonnage...
Advertisement

Related articles

New boxboat Maersk Namsos

Japan's Imabari Shipbuilding successfully delivered Maersk Namsos, a 2,086 twenty-foot equivalent unit (TEU) containership, on 4 June 2025. This...

ABB wins electrical and automation contract for next generation of Petrobras FPSO vessels

ABB has been awarded a large order by Seatrium, a global provider of marine engineering solutions based in...

Stena Futura successfully completes sea trials in China

Stena Line has announced that Stena Futura, the first of its new hybrid ferries destined for the Irish...

New Ulstein based fibre-optic cable-laying vessel

In June 2025 Megamas Resources announced a ship design contract with Norway-based Ulstein Design & Solutions AS to...