Advertisement

UPGRADE WORK: Major upgrade for Seawell

After having successfully docked and repaired MSV Well Enhancer earlier in the year, Damen Shiprepair Vlissingen, part of Damen Shiprepair & Conversion, undertook another major upgrade during November 2014, this time of the Aberdeen-registered light well intervention/dive support vessel MSV Seawell (1986/9,158gt).

As the upgrade took place during the winter, Damen Shiprepair Vlissingen (DSV) will use their covered drydock with a 300-ton capacity overhead crane. The upgrade includes an exchange of all six gensets, overhaul of all thrusters and azimuths, replacement of two cherry pickers and the existing twin slewing cranes by a new single-boom 50-ton crane with active heave compensation. As well as the installation of the derrick, adjustments will be made to the operation of the moon pool doors, winches and other equipment.

Ships Montly - January 2024

US Navy lays keel for first Constellation class frigate

The US Navy has held a keel-laying ceremony for the first Constellation-class frigate, USS Constellation (FFG 62) in Wisconsin. Constellation is the first ship of...
Advertisement

Related articles

US Navy lays keel for first Constellation class frigate

The US Navy has held a keel-laying ceremony for the first Constellation-class frigate, USS Constellation (FFG 62) in...

Tillberg Design of Sweden celebrates end of the seven-year Sun Princess Project

Tillberg Design of Sweden (TDoS) – part of the Viken Group – has just completed its involvement on...

Damen launches fully electric Tug for Port of Antwerp-Bruges

On 12 April 2024 Damen Shipyards Group launched the second of its fully electric RSD-E Tugs 2513 at...

MV Balmoral moves to dry dock

As scheduled, on 17 April 2024 the preserved motor vessel Balmoral left her berth at M Shed in...