Advertisement

Major refit at Damen

On 19 December Damen Shiprepair in Rotterdam redelivered Saga Sapphire after her major refit, including the replacement of the ship’s two sewage plants, a job that involved cutting through the hull.

In addition, the vessel’s freshwater tanks were sand-blasted and repainted, but with around 425 people, including members of the ship’s crew, living on board, arrangements had to be made to supply fresh water and remove grey water. Deck steelwork, lifeboats and davits also received attention, as did piping, electrical and hydraulic systems. The 37,000 ton Saga Sapphire sailed on schedule for her Christmas Canary Islands cruise. WM

Ships Montly - January 2024

Damen Naval signs contract for new frigate for Colombia

At Vlissingen, on 4 December 2024, Damen Naval signed a contract with classification society, Lloyd’s Register, on the Plataforma Estratégica de Superficie (PES) frigate...
Advertisement

Related articles

Damen Naval signs contract for new frigate for Colombia

At Vlissingen, on 4 December 2024, Damen Naval signed a contract with classification society, Lloyd’s Register, on the...

Ulstein Verft outfitting first BS Offshore TWIN X-STERN CSOV vessel

The hull of the first TWIN X-STERN Commissioning Service Operation Vessel (CSOV) for BS Offshore arrived at Ulstein...

Wärtsilä propulsion package to power world’s largest methanol-ready cement carrier vessel

Technology group Wärtsilä is focused on supporting the marine industry's efforts to decarbonise operations, driving concrete steps forward....

Anemoi completes installation of Rotor Sails onboard Vale VLOC

Anemoi Marine Technologies completed the installation of five Rotor Sails onboard the 400,000dwt Very Large Ore Carrier (VLOC),...