Advertisement

Tanker retrofit to burn LNG

Sweden’s Furetank Rederi A/B has elected to have its 17,557dwt tanker Fure West refit to burn LNG by having the vessel’s MaK M 43 C main diesel retrofitted in-hull to a 7 cylinder M 46 dual fuel engine with each cylinder developing 900 kW of rated power.

Caterpillar Marine, which supplies Mak engines, is supplying the complete gas system for the 2006-built tanker, including bunker stations, vaporizer and two 4.15m by 24m 255-cubic-meter LNG storage tanks fabricated by Taylor-Wharton.

The project will be the second MaK engine dual fuel retrofit carried out and follows a similar undertaking last year involving Anthony Veder’s 6,554dwt LNG carrier Coral Anthelia.

Ships Montly - January 2024

Barfleur trials in Guernsey go without a hitch

Brittany Ferries' cruise ferry Barfleur successfully carried out berthing trails in St Peter Port on 24 April 2024.  The move follows successful berthing trials...
Advertisement

Related articles

Barfleur trials in Guernsey go without a hitch

Brittany Ferries' cruise ferry Barfleur successfully carried out berthing trails in St Peter Port on 24 April 2024....

Ships Monthly May 2024 issue out now.

The May 2024 issue of Ships Monthly is out now, and is packed with all the usual news...

Damen launches pilot project for circular shipbreaking

Damen Shipyards Group is launching a pilot project in which a small tug will be dismantled at Damen...

INCAT to commence design study for new electric-hybrid ferry with DFDS

On 23 April 2024 Incat Tasmania announced a new partnership with Danish Shipping and Logistics Company DFDS to...