China’s Wuhu Shipyard has started construction on a series of four ultra-efficient heavy lift and project cargo vessels for delivery to Germany-based SAL Heavy Lift in mid-2024 and Jumbo Shipping of the Netherlands in the first half of 2025.
All of the 14,600dwt Orca-class hybrid vessels will measure 149.9m by 27.2m and will be powered by an innovative hybrid propulsion system making use of variable-speed Wärtsilä 32 methanol dual-fuel main engines and an energy storage system (ESS) based on lithium-titanium-oxide (LTO) batteries.
This will allow a service speed of 15-knots while consuming less than 20 tonnes of fuel per day, although the vessels will also be able to trade at a slow speed of 10-knots at 6 tonnes per day while also being able to reach a maximum speed of 18.5 knots for pressing deliveries.
The vessels will feature a single box-shaped cargo hold with hatch covers having a load capacity of 10 tonnes/m2 served by two all-electric 800-tonne Liebherr cranes capable of handling items weighting up to 1,600-tonnes in tandem.
Report by Jim Shaw
For more news like this, subscribe to Ships Monthly here.
For more news like this, visit the news page.
Sign up for Ships Monthly’s FREE e-newsletter here.