Advertisement

NORTH SEA ACCIDENT: Drill platform collision

Production on the Magnus Platform was shut down for approximately 24 hours on 22 April following contact between the Emergency Response and Rescue Vessel (ERRV) Grampian Defender and the installation. Although an investigation into the incident is ongoing, it is understood that the ERRV lost power before drifting and colliding with one of the platform’s support legs.

Damage to the BP-operated Platform is thought to be minimal. However, there was damage to the bow and main mast of Grampian Defender. As a result of the collision, the vessel had to break off from her standby and support role and transit to the port of Fraserburgh in north-east Scotland for an emergency dry-docking.

Purpose-built in 2002 as a Class B ERRV, Grampian Defender has been designed to operate in the harsh environment of the North Sea.

Ships Montly - January 2024

MV Balmoral moves to dry dock

As scheduled, on 17 April 2024 the preserved motor vessel Balmoral left her berth at M Shed in Bristol and sailed under her own...
Advertisement

Related articles

MV Balmoral moves to dry dock

As scheduled, on 17 April 2024 the preserved motor vessel Balmoral left her berth at M Shed in...

Polsteam’s latest bulkers enter service

Polsteam Koprowo, the second in a series of 12 lakermax bulkcarriers, has entered service with Polish ship owner...

New Cunarder Queen Anne makes her debut

Cunard's newest cruise ship, Queen Anne, arrived at her home port of Southampton on 30 April 2024. The...

X-Press Feeders agree with Europe’s ports to help go green

X-Press Feeders, the world's largest independent common carrier, has signed a memorandum of understanding (MOU) with six prominent...