Advertisement

BRITTANY FERRIES: Winter lay-up for Bretagne and Barfleur

Brittany Ferries again seek to maximise off-season deployment with both Bretagne and Barfleur, from the suspended Poole-Cherbourg link, laid up through the coming winter. Idle last winter, the 2009-built Armorique this time has a weekly roster serving Roscoff and St Malo from Plymouth, together with St Malo-Portsmouth sailings. Bretagne resumes on 29 March through to 28 October 2012. No decision has been reached yet on Barfleur’s return to Poole, but 2012 schedules follow a familiar pattern.

Ships Montly - January 2024

Damen signs with Arena Offshore AS for Stan Tugs 1606

Damen Shipyards Group has signed a contract with Istanbul-based Arena Offshore A.S. for the local construction of two Stan Tugs 1606. Arena Offshore. will...
Advertisement

Related articles

Damen signs with Arena Offshore AS for Stan Tugs 1606

Damen Shipyards Group has signed a contract with Istanbul-based Arena Offshore A.S. for the local construction of two...

Irish Ferries moves to sustainable HVO on the Dublin-Holyhead route

Irish Ferries has taken a significant step forward in its commitment to sustainability and innovation with the transition...

Damen signs with İÇDAŞ for local ASD Tug 2813

On 25 March 2025 Damen Shipyards Group signed a contract with İÇDAŞ in Türkiye for the local construction...

WinGD X-EL wins first hybrid integration project for wind-assisted vessels

Swiss marine power company WinGD is to integrate hybrid power and energy systems on four 113,600dwt wind-assisted tankers...