Advertisement

Damen delivers RoRo ferry to the Gambia

Damen has delivered a road ferry to a client in the Gambia more than a month ahead of schedule. The ferry was built entirely in the Netherlands to a very tight deadline, with the hull constructed in just 70 days at Damen’s subsidiary Niron Staal in Amsterdam. The outfitting was then carried out at Damen Shipyards Gorinchem.

Operating from Banjul, the Gambian capital, to Barra, across the mouth of the Gambia River estuary, the passenger and vehicle ferry is designed with a very flexible layout where it can be reconfigured from passenger and vehicle transportation to passenger only – with a maximum of 2,000 persons.

This function makes it ideal to facilitate passenger transport during local celebration days.

Damen Sales Manager Africa, Peter Post comments: “This special ferry has been designed in close cooperation with the client and this has resulted in a safe, fuel efficient and maintenance friendly vessel built to the latest standards in Shipbuilding. The ferry is built under BV class. We are also providing an extensive training package and a long-term maintenance agreement. The vessel will sail under the Gambian flag.”

The ferry was transported via a heavy lift vessel from the Netherlands and arrived safely over a month ahead of schedule, enabling the client to commence operations before the end of Ramadan and in time for associated festivities.

Ships Montly - January 2024

Barfleur trials in Guernsey go without a hitch

Brittany Ferries' cruise ferry Barfleur successfully carried out berthing trails in St Peter Port on 24 April 2024.  The move follows successful berthing trials...
Advertisement

Related articles

Barfleur trials in Guernsey go without a hitch

Brittany Ferries' cruise ferry Barfleur successfully carried out berthing trails in St Peter Port on 24 April 2024....

Ships Monthly May 2024 issue out now.

The May 2024 issue of Ships Monthly is out now, and is packed with all the usual news...

Damen launches pilot project for circular shipbreaking

Damen Shipyards Group is launching a pilot project in which a small tug will be dismantled at Damen...

INCAT to commence design study for new electric-hybrid ferry with DFDS

On 23 April 2024 Incat Tasmania announced a new partnership with Danish Shipping and Logistics Company DFDS to...