Advertisement

Wärtsilä engines and exhaust gas cleaning chosen for new cruise ship

The technology group Wärtsilä has been contracted to supply the engines and exhaust gas cleaning systems for a new 104m long exploration cruise vessel.

The ship is being built at the China Merchants Heavy Industry shipyard in China for Sunstone Ships of Miami, USA. There are options for an additional nine vessels.

The contract with Wärtsilä was placed by Ulstein Design and Solutions of Norway, the company responsible for delivering the design and equipment package to the yard. The order was booked in June 2017.

The supply comprises two 6-cylinder Wärtsilä 20 engines fitted with the Wärtsilä NOR exhaust gas cleaning system, and two 8-cylinder Wärtsilä 20 engines.

The Wärtsilä NOR is based on SCR (Selective Catalytic Reduction) technology. The system is compliant with various NOx (Nitrogen Oxides) emission reduction needs, such as the IMO Tier III rules.

The Wärtsilä equipment will be delivered to the yard in January 2018, and the ship is expected to begin operations in September 2019.

Ships Montly - January 2024

Happy Christmas from Ships Monthly

Happy Christmas to all our readers and contributors. Best wishes for the festive season and a happy and healthy New Year. To keep track of all...
Advertisement

Related articles

Happy Christmas from Ships Monthly

Happy Christmas to all our readers and contributors. Best wishes for the festive season and a happy and healthy...

DFDS looking forward to taking over Jersey ferry services

DFDS, the well-known Danish ferry operator, is set to take over ferry service connecting Jersey with ports in...

Damen delivers second OPV 2600 to Pakistan Navy

Damen Shipyards Group has delivered the second in a series of two Offshore Patrol Vessels (OPV) 2600 to...

Wallenius Marine tests groundbreaking ship design for wind-powered PCTC

Wallenius Marine is conducting advanced wind tunnel tests aimed at realising the world’s first wind-powered PCTC (Pure Car...