Advertisement

INDIAN NAVY: Pride and patience

Indian patience and Russian pride have been sorely tested after the aircraft carrier Vikramaditya stunningly failed maximum power runs during sea trials that were otherwise deemed a great success. The malfunction of seven out of the ship’s eight steam boilers overshadowed the 44,000-tonne ship’s good sea-keeping, excellent manoeuvrability and impressive aviation serials using a pair of MiG-29K fighters.

The latest setback, caused by the deformation of heat insulation lining, will take five months to repair. As further pre-delivery trials cannot be carried out until winter ice has melted, the handover will be delayed until next autumn. Boiler failures were a legacy of the original vessel’s design, where they lasted just 20 per cent of the design life stated by their makers. Theproject to retrofit the former Soviet warship is already more than four years late.

Ships Montly - January 2024

New Cunarder Queen Anne makes her debut

Cunard's newest cruise ship, Queen Anne, arrived at her home port of Southampton on 30 April 2024. The 3,000-passenger ship was watched by hundreds...
Advertisement

Related articles

New Cunarder Queen Anne makes her debut

Cunard's newest cruise ship, Queen Anne, arrived at her home port of Southampton on 30 April 2024. The...

X-Press Feeders agree with Europe’s ports to help go green

X-Press Feeders, the world's largest independent common carrier, has signed a memorandum of understanding (MOU) with six prominent...

Paddle steamer Waverley announced as National Flagship of the Year 2024

Waverley, the World’s last seagoing paddle steamer, has been awarded the prestigious status of National Flagship of the...

Chief Operating Officer Fleet appointed at Stena Line

As of 1 May 2024, Dennis Tetzlaff is Stena Line’s new Chief Operating Officer Fleet and part of...