Advertisement

De Beers diamond mining ship

Africa’s De Beers Marine Namibia has signed an Memorandum of Understanding (MoU) with Norway’s Kleven shipbuilding group covering construction of a new  offshore diamond mining vessel that would be a similar but larger than the 113m by 22m Nujoma, which was delivered to De Beers by Kleven in 2016.

The latest vessel, designed by Norway’s Marin Teknikk AS, will measure 177m by 27m to make it the largest ship yet designed by Marin Teknikk and the longest vessel to date to be built at the Kleven yard in Ulsteinvik, Norway.

The completed vessel will have accommodation for 109 people and will be equipped with a diesel/electric frequency-controlled propulsion system as well as azimuth thrusters integrated with a dynamic positioning system.

Report by Jim Shaw

Ships Montly - January 2024

MV Balmoral moves to dry dock

As scheduled, on 17 April 2024 the preserved motor vessel Balmoral left her berth at M Shed in Bristol and sailed under her own...
Advertisement

Related articles

MV Balmoral moves to dry dock

As scheduled, on 17 April 2024 the preserved motor vessel Balmoral left her berth at M Shed in...

Polsteam’s latest bulkers enter service

Polsteam Koprowo, the second in a series of 12 lakermax bulkcarriers, has entered service with Polish ship owner...

New Cunarder Queen Anne makes her debut

Cunard's newest cruise ship, Queen Anne, arrived at her home port of Southampton on 30 April 2024. The...

X-Press Feeders agree with Europe’s ports to help go green

X-Press Feeders, the world's largest independent common carrier, has signed a memorandum of understanding (MOU) with six prominent...