Advertisement

PORT NEWS: Turbines on the Tyne

The wind turbine installation vessel MPI Adventure has been commissioned by Narec, the National Renewable Energy Centre, to collect a 750-tonne Met Mast fitted with the latest technologies for measuring wind resource and collecting marine conditions and marine life data. She was based three miles off Blyth to measure the wind resource for the proposed Blyth Offshore Wind Demonstration Site. MPI Adventure, said to be the world’s most advanced wind turbine installation vessel, used the Port of Tyne as her base for the duration of her contract off Blyth.

MPI Offshore is a leader in offshore wind turbine installation, operating the world’s largest and most powerful wind turbine installation vessels, MPI Adventure, MPI Discovery and MPI Resolution. Described as the ‘next generation’ of wind turbine installation vessel, MPI Adventure is 138.5m in length and designed to transport, lift and install wind turbines.

Ships Montly - January 2024

Dutch tall ship Oosterschelde on tour

The historic Dutch tall ship Oosterschelde, a three-masted topsail schooner built in 1918 and meticulously restored as a monument of Dutch maritime heritage, has...
Advertisement

Related articles

Dutch tall ship Oosterschelde on tour

The historic Dutch tall ship Oosterschelde, a three-masted topsail schooner built in 1918 and meticulously restored as a...

Bibby’s first hybrid-electric Commissioning Service Operation Vessel

Bibby Marine, a UK-based operator of Service Operation Vessels (SOVs), has celebrated a significant milestone with the keel...

Incat Tasmania Secures Contract to Build Electric Ferries for Denmark

Incat Tasmania has announced its selection to design and build two advanced battery-electric ferries for Molslinjen, a leading...

BAR Technologies Secures Wind Propulsion Deployment on Dual-Fuel Tankers

BAR Technologies has confirmed a landmark order for its WindWings® propulsion system to be installed on two new...