Advertisement

Sembcorp Marine’s Brazilian shipyard completes Petrobras FPSO

Sembcorp Marine’s wholly-owned and operated subsidiary Estaleiro Jurong Aracruz (EJA) has crossed a significant operational milestone with the completion of its first floating production, storage and offloading (FPSO) project.

P-68, a newbuild FPSO vessel, left the shipyard in mid-September 201 and will be deployed to the ultra-deepwater Berbigão and Sururu fields in Brazil’s Santos Basin.

The vessel is constructed for Tupi BV, a consortium comprising Petrobras Netherlands, Total Brazil Services, BG Gas Netherlands Holdings BV (“Shell”) and Galp Sinopec Brazil Services BV (“Petrogal”).

Measuring 316m in length and 54m in width, P-68 will produce up to 150,000 barrels of oil per day (BOPD). It has a 1.6-million-barrel storage capacity and can accommodate 154 persons.

EJA’s P-68 work scope includes fabricating six modules, pipe-racks and a flare, and integrating them on the vessel along with other free issue items. It also executed carry-over works on the FPSO’s hull, which was built by another shipyard

Ships Montly - January 2024

Damen signs with İÇDAŞ for local ASD Tug 2813

On 25 March 2025 Damen Shipyards Group signed a contract with İÇDAŞ in Türkiye for the local construction of an ASD Tug 2813. The...
Advertisement

Related articles

Damen signs with İÇDAŞ for local ASD Tug 2813

On 25 March 2025 Damen Shipyards Group signed a contract with İÇDAŞ in Türkiye for the local construction...

WinGD X-EL wins first hybrid integration project for wind-assisted vessels

Swiss marine power company WinGD is to integrate hybrid power and energy systems on four 113,600dwt wind-assisted tankers...

Ships Monthly May 2025 issue out now

The May 2025 issue of Ships Monthly is out now, and is packed with all the usual news...

CLdN announces multi-million-pound investment in Killingholme terminal

CLdN has announced a substantial investment plan for its terminal at Killingholme on the River Humber. This ambitious...