Advertisement

Berge Bulk vessels to receive Anemoi Rotor Sails in its move towards a zero-emission fleet

Singapore-based dry bulk owner Berge Bulk today announced that it had signed agreements with Anemoi Marine Technologies Ltd – a global leader in wind-assisted propulsion for commercial vessels – to supply and fit two vessels in their dry bulk fleet with Anemoi Rotor Sails.

The first vessel, Berge Neblina, a 388kdwt Valemax ore carrier built in 2012, was made ‘wind-ready’ earlier this year. The structural integration required prior to installing the technology was carried out during a scheduled dry dock.

Four of Anemoi’s large folding deployment Rotor Sails will be installed to improve vessel performance. Folding Rotor Sails can be lowered from the vertical to mitigate the impact on air draught and cargo handling operations.

This flexible “wind-ready” approach has been taken to align with vessel availability and Anemoi’s production slots.

The same approach has been taken with the second vessel, Berge Mulhacen, a 2017-built 210,000dwt Newcastlemax bulk carrier, which will also receive four folding Rotor Sails. Plan approval has been obtained for both ships from DNV.

Berge Bulk leads the dry bulk industry with efficient ship design and operations. It is committed to developing and deploying commercially viable deep-sea zero-emission vessels by 2030.

Rotor Sails are large mechanical sails that harness the renewable power of the wind to reduce emissions and fuel consumption on commercial ships when driven to spin.  Anemoi predicts that the four-rotor system will save Berge Bulk 1200-1500 metric tons of fuel per vessel each year.

Ships Montly - January 2024

Adora Cruises unveils latest itineraries

Adora Cruises has unveiled its 2025 deployment plans for Qingdao. Both of Adora's ships are set to embark from the Chinese port, starting with...
Advertisement

Related articles

Adora Cruises unveils latest itineraries

Adora Cruises has unveiled its 2025 deployment plans for Qingdao. Both of Adora's ships are set to embark...

New OOCL container ship named and enters service

The 165,000dwt OOCL Sunflower, one of a series of ten vessels ordered by OOCL, was officially named at...

Asuka III floated out at Meyer Werft

Meyer Werft's latest newbuilding, the cruise ship Asuka III, left the yard’s building hall on 18 January 2025...

Northern Lighthouse Board New Vessel Enters water for first time

The Northern Lighthouse Board’s new vessel Pole star, currently under construction at Gondan Shipbuilders, Castropol, Asturias Spain, was...