Advertisement

Color Line to futureproof Ro-Pax vessels with Wärtsilä hybrid scrubber upgrade

Technology group Wärtsilä will upgrade the exhaust treatment system onboard four vessels in Norwegian operator Color Line’s fleet. Wärtsilä will add close-looped functionality to the ships’ current open-loop scrubbers, enabling the ships to operate at maximum efficiency, safely and in the most environmentally sustainable way possible. The order was booked by Wärtsilä in Q3 2024.

As maritime’s drive for energy efficiency and emissions reductions become ever more urgent, ship owners and operators, such as Color Line, are seeking solutions which will help them to optimise vessel performance and reach sustainability targets.

The upgrade to a hybrid scrubber system onboard these ships will give Color Line control over any abatement from the scrubber wash water, ensuring its vessels remain compliant with tightening regulations.

“This scrubber upgrade supports our focus on minimising the environmental impact of our operations. Switching to Wärtsilä’s system will not only ensure our continued compliance with existing rules and regulations, but will also future-proof our vessels against future requirements,” says Per Erik Olsen, EVP Color Line Marine.

Wärtsilä’s hybrid scrubber systems feature the latest in exhaust cleaning technology, thus minimising sulphur oxide (SOx) emissions and allowing the vessel to comply with emission control regulations around the world.

The solution, which has the flexibility to operate in both open and closed loop using seawater to remove SOx from the exhaust, removes 98 percent of SOx emissions. This also notably reduces nitrogen oxide (NOx) and particulate matter emissions.

The upgrade will be carried out on two large Ro-Pax and two high-speed Ro-Pax vessels, which sail between Norway and Denmark, and Norway and Germany, and will commence at the latter end of 2024.

Ships Montly - January 2024

Stena Line announces plans to withdraw its Rosslare-Cherbourg service 

Following a strategic route review, Stena Line has announced that from 30 September 2025, the ferry operator intends to withdraw its existing three-day Rosslare-Cherbourg...
Advertisement

Related articles

Stena Line announces plans to withdraw its Rosslare-Cherbourg service 

Following a strategic route review, Stena Line has announced that from 30 September 2025, the ferry operator intends...

Deltamarin wins contract for six ro-pax vessels for Grimaldi Lines

On 24 June 2025 Deltamarin signed a design and engineering contract with China Merchants Jinling Shipyard (Weihai) for...

New boxboat Maersk Namsos

Japan's Imabari Shipbuilding successfully delivered Maersk Namsos, a 2,086 twenty-foot equivalent unit (TEU) containership, on 4 June 2025. This...

ABB wins electrical and automation contract for next generation of Petrobras FPSO vessels

ABB has been awarded a large order by Seatrium, a global provider of marine engineering solutions based in...