Advertisement

Contract for construction of frigate for Colombian Navy in Colombia

In Cartagena, Colombia, the Corporación de Ciencia y Tecnología para el Desarrollo de la Industria Naval, Marítima y Fluvial (COTECMAR) and Damen Shipyards Group signed a contract for technical support and the supply of components for the construction of the Plataforma Estratégica de Superficie (PES – Strategic Surface Platform). It will be the first frigate to be built in Colombia. This is being done by COTECMAR based on Damen’s SIGMA 10514 model.

The ship represents a significant investment in local employment and technological development of the Colombian maritime industry and thus in the national economy.

The ship will have a length of 107.5m and a beam of 14.02m. After Mexico and Brazil, Colombia will be the third country in Latin America that is able to build these types of complex naval vessels under license at its own shipyards.

Admiral Rozo spoke of a “historic day, both for the Colombian Navy and for COTECMAR”. Roland Briene added that Damen Shipyards Group is particularly proud to be able to carry out this order together with COTECMAR.

Pieter Becker indicated that he was looking forward to the start of the construction of this vessel and indicated that the order was partly due to the good cooperation that COTECMAR and Damen developed during the recent construction of the oceanographic and arctic research vessel Simón Bolívar.

Ships Montly - January 2024

Damen cuts steel on latest Island Class vessel for BC Ferries

On 16 January 2025 Damen Shipyards Galati cut steel on the third vessel in an order of four Island Class Ferries from Canada’s BC...
Advertisement

Related articles

Damen cuts steel on latest Island Class vessel for BC Ferries

On 16 January 2025 Damen Shipyards Galati cut steel on the third vessel in an order of four...

Adora Cruises unveils latest itineraries

Adora Cruises has unveiled its 2025 deployment plans for Qingdao. Both of Adora's ships are set to embark...

New OOCL container ship named and enters service

The 165,000dwt OOCL Sunflower, one of a series of ten vessels ordered by OOCL, was officially named at...

Asuka III floated out at Meyer Werft

Meyer Werft's latest newbuilding, the cruise ship Asuka III, left the yard’s building hall on 18 January 2025...