Advertisement

Damen Shipyards Sharjah celebrates ten-year anniversary

On 13 January 2024 Damen Shipyards Sharjah (DSS) celebrated its tenth anniversary. Starting out in 2012 on undeveloped ground, DSS has grown into a state-of-the-art shipyard covering 200,000m2. It features large construction halls and eleven repair berths, including one covered berth.

Over the last decade, the shipyard has developed a strong track record, delivering 90 new vessels. Amongst these, is the largest newbuild vessel constructed in the UAE; a project DSS managed to safely undertake during the coronavirus pandemic.

Additionally, the yard has undertaken over 3,000 repair projects including more than 1,000 dockings, 2,000 quayside repairs and ten major conversions.

Since it began its operations, DSS has invested continually in the development of both its technology and its personnel. For example, the yard offers opportunities to talented people via Albwardy Damen’s in-house graduate scheme. The results of this people development are clearly visible in the make-up of the team, where 75% of middle management have risen through the ranks internally.

The yard boasts a highly skilled team of engineers available 24/7. With all major trades in house, DSS serves its clients as a one-stop-shop able to carry out 90% of its work with its own personnel.

DSS has full capabilities to carry out emergency repairs, including to fire damaged vessels. The yard’s broad scope includes propeller repair, hydraulics and electric work, carpentry, 3D scanning, GRE and CNC pipework, underwater performance and diving work. Together with the other Albwardy Damen locations, the yard serves as OEM representative for a number of globally recognised manufacturers.

Ships Montly - January 2024

Glen Rosa reaches key milestone in delivery as the vessel enters dry dock

Glen Rosa, the second of two dual fuel ferries being built by Ferguson Marine (Port Glasgow) Ltd, has been moved to dry dock marking...
Advertisement

Related articles

Glen Rosa reaches key milestone in delivery as the vessel enters dry dock

Glen Rosa, the second of two dual fuel ferries being built by Ferguson Marine (Port Glasgow) Ltd, has...

Helsinki and Tallinn route celebrates 60 years

The scheduled passenger ferry service between Finland and Estonia marked a major milestone, celebratign its 60th anniversary on...

WinGD’s first ammonia-fuelled engine installed on EXMAR vessels

Swiss marine power company WinGD has become the first engine designer to bring an ammonia-fuelled two-stroke marine engine...

Ever Atop breaks boxboat records at Felixstowe

The container ship Ever Atop, operated by the Evergreen Line, set a new benchmark by becoming the deepest...