Advertisement

Damen to build second Damen Commissioning Service Operation Vessel for TSSM

Ta San Shang Marine Co Ltd (TSSM), the joint venture between Mitsui OSK Lines of Japan, and Ta Tong Marine Co Ltd of Taiwan, has ordered a second Damen CSOV (Commissioning Service Operation Vessel) 9020. With a delivery date planned for end 2026, TSSM will deploy the new vessel in Taiwanese offshore wind farms.

When the new vessel is delivered, TSSM will have a fleet of three Service Operation Vessels. The first, TSS Pioneer, was delivered in 2022. The second, TSS Cruiser, is a Damen CSOV which was ordered in November 2023 and is scheduled for delivery at the end of 2025.

Just as with the sister vessel TSS Cruiser, Damen will build this second CSOV in Vietnam. The 90m-long vessel will provide high quality accommodation for up to 120 people on board working on the wind farms during their construction and operational phases.

These personnel will reach their offshore workplace safely and effectively via a motion compensated gangway. The new vessel will be equipped with a diesel-battery hybrid power generation system and will be fully ‘methanol-ready’ like TSS Cruiser.

Ships Montly - January 2024

North Star marks delivery of first CSOV Grampian Kestrel

North Star officially named its first commissioning service operation vessel (CSOV), Grampian Kestrel, at a ceremony at VARD’s shipyard in Tomrefjord, Norway, Vard Langsten...
Advertisement

Related articles

North Star marks delivery of first CSOV Grampian Kestrel

North Star officially named its first commissioning service operation vessel (CSOV), Grampian Kestrel, at a ceremony at VARD’s...

Celestyal Discovery operates on a marine biofuel blend

The cruise ship Celestyal Discovery made history in April 2025 as the first ship in Greek waters to...

New multi-purpose vessels delivered by China Merchants

Nanjing Jinling Shipyard, a division of China Merchants Industry, has successfully delivered the 62,000dwt ultra-flexible multi-purpose vessel Pacific...

Stena Line set to return to normal timetable as Holyhead Port repairs near completion

Stena Line welcomed a statement from Holyhead Port on 8 May 2025 that, following the completion of necessary...