Advertisement

New Damen Fishery Research Vessel ordered

The Damen Shipyards Group has received an order for a state-of-the-art, 74 m Fishery Research Vessel from the Angolan Ministry of Fisheries. This special vessel has Silent-A/F/R Class notation and features a basic design from Skipsteknisk.

The Angolan Ministry of Fisheries has been a customer for many years and previously Damen delivered two 62 m Fishery Inspection Surveillance Vessels 6210 and a smaller Fishery Research Vessel (FRV 2808). This vessel represents the cutting edge of its type and Damen is confident that it will help develop and preserve the important Angolan fishing economy.

Hein van Ameijden, Managing Director of Damen Schelde Naval Shipbuilding, commented that the yard’s vast naval building expertise can also be applied to this innovative research ship. Any successful research vessel has to operate extremely quietly and Damen has the expert knowledge needed to achieve the Silent notation for the FRV, he says.

Special attention will be paid to the design, construction and outfitting of the vessel to minimise underwater noise, as well as onboard internal acoustic noise and vibrations. Machinery components, including pumps and ventilation plants, will be resiliently mounted where necessary to reduce noise and vibrations. The stiffness of foundations and supports for all the noise critical components and pipe systems will also be thoroughly checked to ensure that they comply with the Silent notation.

The FRV 7417 is suitable for various functions such as hydrographic operations, acoustics research, pelagic and demersal trawling, plankton, water, environmental and geographical sampling, oil recovery and emergency towage operations. The new FRV has a service speed of 13 knots.

Ships Montly - January 2024

Wallenius Marine tests groundbreaking ship design for wind-powered PCTC

Wallenius Marine is conducting advanced wind tunnel tests aimed at realising the world’s first wind-powered PCTC (Pure Car and Truck Carrier) vessel. The tests...
Advertisement

Related articles

Wallenius Marine tests groundbreaking ship design for wind-powered PCTC

Wallenius Marine is conducting advanced wind tunnel tests aimed at realising the world’s first wind-powered PCTC (Pure Car...

Ships Monthly January 2025 issue out now

The January 2025 issue of Ships Monthly is out now, and is packed with all the usual news...

Ice breaker Storis set for US Arctic role

A week after the ice breaker Aiviq arrived at Tampa Ship LLC in Florida, the vessel had been...

Giant FPSO arrives in Brazilian waters

Towed by the oceangoing tugs BOKA Defender, BOKA Expedition and BOKA Sherpa, the FPSO Almirante Tamandaré arrived in...