Advertisement

New Polar Vessel for Brazilian Navy

Technology group Wärtsilä will supply the main power generation and power conversion system for a new 103.16m Antarctic Support Vessel being built for the Brazilian Navy.

The order was placed by Brazil’s Estaleiro Jurong Aracruz shipyard and will be booked with Wärtsilä in Q3 2023.

The new Polar Vessel – Navio Polar Almirante Saldanha (NPo) – will be operated by the Brazilian Navy and is of strategic importance for maintaining the Brazilian presence in the Antarctic continent and ensuring the continuity of the scientific research that has been carried out at the Comandante Ferraz Antarctic Station.

Wärtsilä will supply three Wärtsilä 32 diesel generating sets, a diesel-electric power conversion system and two bow thruster drive systems, as well as the Power Management System.

Wärtsilä’s low emission energy efficient solution ensures optimum performance, combined with high redundancy and availability, thanks to long times between overhauls and low fuel consumption. thanks to long times between overhauls and low fuel consumption.

Ships Montly - January 2024

Happy Christmas from Ships Monthly

Happy Christmas to all our readers and contributors. Best wishes for the festive season and a happy and healthy New Year. To keep track of all...
Advertisement

Related articles

Happy Christmas from Ships Monthly

Happy Christmas to all our readers and contributors. Best wishes for the festive season and a happy and healthy...

DFDS looking forward to taking over Jersey ferry services

DFDS, the well-known Danish ferry operator, is set to take over ferry service connecting Jersey with ports in...

Damen delivers second OPV 2600 to Pakistan Navy

Damen Shipyards Group has delivered the second in a series of two Offshore Patrol Vessels (OPV) 2600 to...

Wallenius Marine tests groundbreaking ship design for wind-powered PCTC

Wallenius Marine is conducting advanced wind tunnel tests aimed at realising the world’s first wind-powered PCTC (Pure Car...