Advertisement

NEWBUILD: Icebreaking supply vessel

The production of the icebreaking multipurpose supply vessel for Sovcomflot was started with steel cutting on 26 November 2014. The ceremony took place at Vyborg Shipyard, where the blocks of the vessel are produced. The event was attended by representatives from Sovcomflot, United Shipbuilding Corporation, Russian Maritime Register of Shipping, Vyborg Shipyard and Arctech Helsinki Shipyard.

The design, hull assembly, outfitting and commissioning of the vessel will be done by Arctech Helsinki Shipyard. The new vessel is being built to transport supplies and people between land bases and production platforms in the harsh climatic areas of the Sea of Okhotsk. The new icebreaking offshore vessel (pictured) measures 100m by 21m and is due to be delivered in June 2016.

Ships Montly - January 2024

CMA CGM take delivery of LNG-powered CMA CGM Sainte Anne

Container shipping company CMA CGM took delivery of the LNG-powered CMA CGM Sainte Anne during January. The vessel is the tenth vessel in a series...
Advertisement

Related articles

CMA CGM take delivery of LNG-powered CMA CGM Sainte Anne

Container shipping company CMA CGM took delivery of the LNG-powered CMA CGM Sainte Anne during January. The vessel is...

Green Navy receives €1.5 million support for Prometeo Project

The Brittany Region has granted a subsidy of €1.5 million to Green Navy for its hydrogen-powered passenger shuttle...

Stena Line posts record freight volumes on Belfast routes

2024 was a record year for Stena Line freight volumes on its three Belfast services with almost 600,000...

Carnival set to offer roundtrip cruises from Singapore

Carnival Cruise Line is set to offer a roundtrip cruise from Singapore in 2027 as part of a...