Advertisement

Norbank makes her maiden port call to Tilbury in Essex for berthing trials

P&O 1993-built ro-ro ferry Norbank made her maiden port call to Tilbury 2 in Essex to undergo berthing trials on 4 January 2024.

If successful, a new P&O service will run from Tilbury 2 on the River Thames too Rotterdam.

Norbank made her final departure from the Dublin-Liverpool service on 20 December 2023, with P&O closing its Irish Sea service and withdrawing both Norbank and her sistership Norbay.

Bad weather on Norbank’s final crossing to the Mersey meant she was late to lock in at Liverpool and the last scheduled sailing on 21 December cancelled.

Norbank will be used to cover ships on Europoort routes undergoing routine drydocking until the mid February.

Photo by Fraser Gray

 

 

Ships Montly - January 2024

Stena Line announces plans to withdraw its Rosslare-Cherbourg service 

Following a strategic route review, Stena Line has announced that from 30 September 2025, the ferry operator intends to withdraw its existing three-day Rosslare-Cherbourg...
Advertisement

Related articles

Stena Line announces plans to withdraw its Rosslare-Cherbourg service 

Following a strategic route review, Stena Line has announced that from 30 September 2025, the ferry operator intends...

Deltamarin wins contract for six ro-pax vessels for Grimaldi Lines

On 24 June 2025 Deltamarin signed a design and engineering contract with China Merchants Jinling Shipyard (Weihai) for...

New boxboat Maersk Namsos

Japan's Imabari Shipbuilding successfully delivered Maersk Namsos, a 2,086 twenty-foot equivalent unit (TEU) containership, on 4 June 2025. This...

ABB wins electrical and automation contract for next generation of Petrobras FPSO vessels

ABB has been awarded a large order by Seatrium, a global provider of marine engineering solutions based in...