Advertisement

PORT NEWS: Bad weather causes problems

The Lerwick Port Authority, together with the Tall Ship Race committee, decided to postpone the start of Race 2 from Lerwick to Stavanger for 24 hours due to bad weather on 24 July. This was due to a complex low near Denmark, which maintained strong northerly winds through the area. At the same time the cruise ship Crystal Serenity (2003/68,870gt, pictured below), which was due to arrive in Lerwick on 24 July, turned round just after midnight when off Arbroath and turned south to the river Forth, disappointing passengers wanting to see the Tall Ships.

Ships Montly - January 2024

WinGD X-EL wins first hybrid integration project for wind-assisted vessels

Swiss marine power company WinGD is to integrate hybrid power and energy systems on four 113,600dwt wind-assisted tankers under construction for Union Maritime Limited...
Advertisement

Related articles

WinGD X-EL wins first hybrid integration project for wind-assisted vessels

Swiss marine power company WinGD is to integrate hybrid power and energy systems on four 113,600dwt wind-assisted tankers...

Ships Monthly May 2025 issue out now

The May 2025 issue of Ships Monthly is out now, and is packed with all the usual news...

CLdN announces multi-million-pound investment in Killingholme terminal

CLdN has announced a substantial investment plan for its terminal at Killingholme on the River Humber. This ambitious...

Approval in principle for retrofitted methanol dual fuel Kamsarmax bulk carrier

ClassNK has granted an Approval in Principle (AiP)1 for the design concept of a retrofitted Kamsarmax bulk carrier,...