Advertisement

QE2 Holdings: Renovation to start soon

On 15 October 2013 the operator of Queen Elizabeth 2, QE2 Holdings, signed a contract with the COSCO shipyard at Zhoushan in Zheijiang Province, China for the rebuilding of the interiors of the ship. At that stage the exact natuAre of the work was still undecided, although what had been decided was that the 990 cabins would be replaced with 400 luxury suites.

The remainder of the work will be decided after a winner has been picked from seven major interior design houses, who have been chosento submit proposals for the public spaces. Oceanic Group International Limited, the technical managers, will oversee the work.

Ships Montly - January 2024

Damen launches fully electric-ready ferry for BC Ferries

On 22 May Damen Shipyards Galati in Romania launched the latest Island Class Ferry for BC Ferries. The vessel, a Damen RoRo 8117 E3,...
Advertisement

Related articles

Damen launches fully electric-ready ferry for BC Ferries

On 22 May Damen Shipyards Galati in Romania launched the latest Island Class Ferry for BC Ferries. The...

ABB extends lifespan of Helsinki ferry by retrofitting propulsion drive

The passenger ferry Suomenlinna II has become the first ship to be retrofitted with ABB’s new-generation ACS880LC drive....

Foreship enables dual battery system to boost zero-emission power for Wasaline

Naval architecture and engineering consultancy Foreship is supporting Wasaline in delivering a breakthrough battery upgrade on Aurora Botnia...

Furetank participates in historic national defense exercise

In September Sweden will carry out its largest maritime defense drill since World War II. Furetank will participate...