Advertisement

The oldest active icebreaker

The Finnish icebreaker Voima (Strength) is celebrating its 70th birthday this year as the oldest ship of its class still in active service. Completed by the Wärtsilä Helsinki shipyard in 1954 as the first of a new series of icebreakers to emerge from Finland’s post-war reconstruction programme, the 4,159grt Voima was equipped with two symmetrical propellers of opposite rotation driven by six Atlas Polar engines developing a total of 9,000 kW.

Between 1978 and 1979 the vessel was extensively modernised when six Wärtsilä 16V22 engines totaling 12,840 kW took the place of the older Atlas units while the interior was completely renovated to meet modern standards and a new navigation bridge installed.

In addition, the ship’s hull sides were reinforced with new plates to increase protection against ice pressure. Today, the 70-year-old icebreaker measures 83.5m by 19.4m on a displacement of 5,209 tonnes and is capable of maintaining a speed of 16 knots while having a bollard pull of 113 tonnes.

(Caption: Built in 1954, the Finnish icebreaker Voima has been modernised with new engines and a new accommodation block and bridge over the years. Shipspotting/Jukka Koskimies)

Ships Montly - January 2024

North Star marks delivery of first CSOV Grampian Kestrel

North Star officially named its first commissioning service operation vessel (CSOV), Grampian Kestrel, at a ceremony at VARD’s shipyard in Tomrefjord, Norway, Vard Langsten...
Advertisement

Related articles

North Star marks delivery of first CSOV Grampian Kestrel

North Star officially named its first commissioning service operation vessel (CSOV), Grampian Kestrel, at a ceremony at VARD’s...

Celestyal Discovery operates on a marine biofuel blend

The cruise ship Celestyal Discovery made history in April 2025 as the first ship in Greek waters to...

New multi-purpose vessels delivered by China Merchants

Nanjing Jinling Shipyard, a division of China Merchants Industry, has successfully delivered the 62,000dwt ultra-flexible multi-purpose vessel Pacific...

Stena Line set to return to normal timetable as Holyhead Port repairs near completion

Stena Line welcomed a statement from Holyhead Port on 8 May 2025 that, following the completion of necessary...