Advertisement

Ulstein Verft to construct large cable laying vessel for Nexans

Nexans Subsea Operations announced a shipbuilding contract with Ulstein Verft on the construction of a large, DP3 cable laying vessel on 4 July.

CEO Gunvor Ulstein, Ulstein Group, said: “We are very pleased that Nexans has chosen Ulstein to construct their new flag ship.

“We have a strong organisation with long experience in delivering advanced vessels. The contract was won in tough, international competition. We look forward to a constructive and fruitful cooperation with Nexans in the years to come”.

The vessel will be outfitted for power cable laying, including bundle laying, cable jointing and repair and cable system protection and trenching. The ST-297 CLV is designed by Skipsteknisk, Ålesund.

The vessel is developed for operations in rough weather and has high manoeuvrability and station keeping capabilities. Ulstein Verft will construct the vessel and prepare for the topside equipment.

The advanced cable laying vessel has a turntable with a large cable capacity of 10,000 tonnes, and the fibre optic basket holds 450 tonnes.

The vessel is 31 m wide, 149.9 m long, with a deadweight of 17,000 tonnes, and she can accommodate 90 people.

“We are experienced in constructing large and complex vessels and we look forward to commencing the work on the cable laying vessel for Nexans”, says Kristian Sætre, managing director at Ulstein Verft.

Nexans’s core activity consists of advanced cabling and connectivity solutions. With a 120-year history, the company of today employs more than 26,000 people.

Norway-headquartered Ulstein Group is a family-run company established in 1917, and specialised in ship design, shipbuilding, systems and services for the maritime market.

The ship design company Skipsteknisk was established in 1976 and designs specialised vessels with emphasis on offshore, research and fisheries.

Ships Montly - January 2024

Bulker stuck fast in St Lawrence Seaway

The Canadian bulker Tim S. Dool (28,471 dwt) has been stuck the St Lawrence River southwest of Montreal for more than a week. Several...
Advertisement

Related articles

Bulker stuck fast in St Lawrence Seaway

The Canadian bulker Tim S. Dool (28,471 dwt) has been stuck the St Lawrence River southwest of Montreal...

SunStone’s latest expedition cruise vessel, Douglas Mawson launched

SunStone Maritime Group has successfully launched its latest expedition cruise vessel, Douglas Mawson, which is the seventh and...

Condor Liberation returns from overhaul

Condor Ferries' Austal-built HSC Condor Liberation (2010/6,307gt) returned to Poole at the beginning of December following its out-of-water...

Norwegian Star completes dry docking

Norwegian Star recently underwent a three-week drydock at Damen Shiprepair Brest in Northern France. After completing a summer...