Advertisement

Van Oord hosts christening ceremony for Vox Apolonia

Van Oord celebrated the christening of brand new trailing suction hopper dredger Vox Apolonia in March 2023.

Vox Apolonia is Van Oord’s second hopper dredger equipped with an LNG fuel system and an outstanding example of its sustainable ambitions.

Triplets Vox Apolonia is the sister vessel of the LNG-powered trailing suction hopper dredgers Vox Ariane and Vox Alexia.

Vox Ariane was christened in June 2022 and has already been successfully deployed on several projects. Vox Alexia is in the final stages of construction in Singapore.

These new vessels have a hopper capacity of approximately 10,500 cubic metres and measure 137.5m in length and 27.6m across the beam.

Van Oord operates trailing suction hopper dredgers for a wide range of global activities, such as coastal protection, port construction, deepening waterways and land reclamation.

The three new vessels will help Van Oord accomplish the aim of modernising its fleet and making it more economical and energy efficient.

Their LNG fuel system and energy-efficient design will reduce fuel consumption and carbon emissions substantially.

Ships Montly - January 2024

North Star marks delivery of first CSOV Grampian Kestrel

North Star officially named its first commissioning service operation vessel (CSOV), Grampian Kestrel, at a ceremony at VARD’s shipyard in Tomrefjord, Norway, Vard Langsten...
Advertisement

Related articles

North Star marks delivery of first CSOV Grampian Kestrel

North Star officially named its first commissioning service operation vessel (CSOV), Grampian Kestrel, at a ceremony at VARD’s...

Celestyal Discovery operates on a marine biofuel blend

The cruise ship Celestyal Discovery made history in April 2025 as the first ship in Greek waters to...

New multi-purpose vessels delivered by China Merchants

Nanjing Jinling Shipyard, a division of China Merchants Industry, has successfully delivered the 62,000dwt ultra-flexible multi-purpose vessel Pacific...

Stena Line set to return to normal timetable as Holyhead Port repairs near completion

Stena Line welcomed a statement from Holyhead Port on 8 May 2025 that, following the completion of necessary...