Advertisement

Wärtsilä’s new Compact Reliq selected for two newbuild LNG Carriers

The technology group Wärtsilä’s recently introduced Compact Reliq reliquefaction plant will be installed in two new LNG Carrier vessels being built for Norway-based Knutsen OAS Shipping.

The ships are to be built at the Hyundai Heavy Industries shipyard in South Korea. The order, which includes an option for an additional two vessels, was placed in November 2020.

The Compact Reliq solution is based on the well-proven reversed nitrogen Brayton cycle refrigeration technology.

The solution is designed to reliquefy the boil-off gas (BOG) from gas carriers and LNG bunker vessels, and for keeping the cargo cool under all operating conditions.

It allows a portion of the BOG to be used as fuel for the ship’s engines, with the excess able to be sold as part of the LNG cargo.

The system will be instrumented for remote monitoring and online operational support as part of Wärtsilä’s Operational Performance Improvement and Monitoring (OPERIM) programme.

The equipment is scheduled to be delivered to the yard commencing in February 2022, and the vessels are expected to begin commercial operations from late 2022.

Wärtsilä has earlier supplied Knutsen OAS Shipping with earlier generation reliquefaction plants for six of the company’s vessels.

The compact design of the Wärtsilä Compact Reliq makes it easy to retrofit on existing ships without the need for extensive modifications. It features high reliability and a minimal maintenance requirement. The refrigeration process uses safe and easily obtainable commercial grade nitrogen.

Ships Montly - January 2024

Ambassador Cruise Line and CFC to Merge

Ambassador Cruise Line and Compagnie Française de Croisières (CFC) have announced their merger to form the Ambassador Group. The new entity aims to become...
Advertisement

Related articles

Ambassador Cruise Line and CFC to Merge

Ambassador Cruise Line and Compagnie Française de Croisières (CFC) have announced their merger to form the Ambassador Group....

Stena Line ferry services resume from Holyhead

Stena Line’s ferry services on the Holyhead-Dublin route resumed on 16 January 2025 following the closure of the...

Damen signs contract with New Zealand ports for new dredger

Damen Shipyards Group and Port Otago with partner Napier Port have signed a contract for the delivery of...

Ruby’s cargo of fertiliser transported to Ivory Coast

The saga of the damaged cargo vessel Ruby neared a conclusion with the transfer of her dangerous cargo...