Advertisement

BRITTANY FERRIES: Winter lay-up for Bretagne and Barfleur

Brittany Ferries again seek to maximise off-season deployment with both Bretagne and Barfleur, from the suspended Poole-Cherbourg link, laid up through the coming winter. Idle last winter, the 2009-built Armorique this time has a weekly roster serving Roscoff and St Malo from Plymouth, together with St Malo-Portsmouth sailings. Bretagne resumes on 29 March through to 28 October 2012. No decision has been reached yet on Barfleur’s return to Poole, but 2012 schedules follow a familiar pattern.

Ships Montly - January 2024

COSCO Shipping welcomes new PCTC

On 10 July 2024, COSCO Shipping Special Transport celebrated the arrival of its first 7,500-vehicle LNG dual-fuel Pure Car and Truck Carrier (PCTC), Liaohekou,...
Advertisement

Related articles

COSCO Shipping welcomes new PCTC

On 10 July 2024, COSCO Shipping Special Transport celebrated the arrival of its first 7,500-vehicle LNG dual-fuel Pure...

Ships Monthly bumper 92–page August issue out now

The bumper August 2024 issue of Ships Monthly is out now, and is packed with all the usual...

New North Star vessel bound for East Anglia THREE windfarm

North Star has secured a contract with Siemens Gamesa to build a hybrid service operations vessel (SOV) bound...

Damen to build second Damen Commissioning Service Operation Vessel for TSSM

Ta San Shang Marine Co Ltd (TSSM), the joint venture between Mitsui OSK Lines of Japan, and Ta...