Advertisement

Crystal Cruises concludes SS United States technical feasibility study

Following an intensive, six-month evaluation, Crystal Cruises has decided that, while SS United States is structurally sound, the technical and commercial challenges associated with returning the historic liner to service as a modern cruise ship have unfortunately proven insurmountable.

As a show of support for the vessel, Crystal Cruises will be making a significant donation of $350,000 to aid in the Conservancy’s ongoing mission to save the ship. The Conservancy intends to resume its pursuit of stationary redevelopment opportunities for America’s Flagship.

In February, Crystal and the SS United States Conservancy announced they had entered into an exclusive option agreement with the goal of converting the iconic 1950’s-era vessel into a modern, luxury cruise ship that would comply with all modern safety and technical standards – unprecedented for a single vessel refurbishment.

Crystal commenced a comprehensive feasibility study and professional evaluation, convening a world-class team of engineers and experts while incurring over $1 million in costs.

“Over the past six months, Crystal has conducted an extensive feasibility study to restore ‘America’s Flagship’ to oceangoing service. Unfortunately, the hurdles that would face us when trying to bring a 65-year-old vessel up to modern safety, design and international regulatory compliance have proven just too great to clear in both a technically and commercially responsible manner,” said Crystal President and CEO Edie Rodriguez.

“While it has been determined that Crystal’s exciting vision for the ship would have required overcoming various technical hurdles and major changes to her historic design, the studies performed have confirmed the ship is structurally sound,” said Susan Gibbs, Executive Director of the SS United States Conservancy. “America’s Flagship continues to hold enormous potential as a stationary mixed-use development and museum in New York or another urban waterfront setting. The SS United States Conservancy remains deeply committed to saving this unique and powerful symbol of the nation’s strength, history, and innovation.”

Led by retired US Coast Guard Rear Admiral Tim Sullivan, Crystal’s impressive team of maritime experts and engineers conducted numerous assessments on the ship in the Port of Philadelphia, where it has been docked for 20 years. The evaluation and testing included in-depth assessments of the ship’s structural condition; underwater inspections of the hull by divers; the examination of her fuel and salt water ballasting tanks; and a series of intensive engineering studies to deduce what would be needed to bring her back into service.

Regrettably, the technical feasibility study concluded that while the ship is remarkably intact and structurally sound, modifying the ship for today’s standards for oceangoing service (SOLAS) would require significant changes to the hull that would pose stability challenges.

Additionally, the installation of a modern, state-of-the-art diesel electric propulsion plant would have necessitated altering of the existing shaft lines and rebuilding about 25 percent of the hull to reconfigure the ship to a twin shaft-twin rudder arrangement.

While it was known that the vessel would need to have been essentially rebuilt from the inside out, these specific challenges, among others, collectively posed significant risk to the success of the project.

 

 

Ships Montly - January 2024

ADNOC, Jiangnan Shipyard and DNV celebrate delivery of new Flex LNG Carrier

The Abu Dhabi National Oil Company (ADNOC), Jiangnan Shipyard (Group) Co., Ltd., and classification society DNV, celebrated the naming and delivery ceremony of China's...
Advertisement

Related articles

ADNOC, Jiangnan Shipyard and DNV celebrate delivery of new Flex LNG Carrier

The Abu Dhabi National Oil Company (ADNOC), Jiangnan Shipyard (Group) Co., Ltd., and classification society DNV, celebrated the...

Viking Celebrates with Naming of newest Ocean Ship

Viking recently named its newest ocean ship, Viking Vela, during a traditional ceremony in Trieste, Italy. This event...

SH Diana departs Ushuaia for first dedicated Antarctic cruise of season after propulsion motor repair

After a prompt repair to one of its electric propulsion motors, Swan Hellenic's SH Diana departed Ushuaia for...

New liquefied CO₂ carrier Northern Pioneer ready

On 22 November 2024 Dalian Shipbuilding Industry Co Ltd hosted a ceremony to commemorate the readiness of the...