Advertisement

New wind farm cable layer

Norway’s Siem Offshore Contractors has placed the cable installation and repair vessel Siem Aimery into service under a long-term contract with associated Siem Offshore.
Completed by Poland’s Remontowa Shipbuilding, the new 4,500dwt ship has been specifically designed to handle the installation and repair of medium and high voltage submarine cables, and carries two cable carousels low in the hull as well as a cable working deck outfitted with an ‘A’ frame and cranes.
The 95.3m by 21.5m newbuild has entered employment by installing the inner array grid and export cable systems for the Nordsee One wind farm off Germany after which it will move to the Veja Mate wind farm being built in the German Bight.
Ships Montly - January 2024

Irish Ferries moves to sustainable HVO on the Dublin-Holyhead route

Irish Ferries has taken a significant step forward in its commitment to sustainability and innovation with the transition of its Dublin Swift service on the...
Advertisement

Related articles

Irish Ferries moves to sustainable HVO on the Dublin-Holyhead route

Irish Ferries has taken a significant step forward in its commitment to sustainability and innovation with the transition...

Damen signs with İÇDAŞ for local ASD Tug 2813

On 25 March 2025 Damen Shipyards Group signed a contract with İÇDAŞ in Türkiye for the local construction...

WinGD X-EL wins first hybrid integration project for wind-assisted vessels

Swiss marine power company WinGD is to integrate hybrid power and energy systems on four 113,600dwt wind-assisted tankers...

Ships Monthly May 2025 issue out now

The May 2025 issue of Ships Monthly is out now, and is packed with all the usual news...