Advertisement

TIMELAPSE @ TANKER SHIP

Onboard A tanker ship for 6 months doing ship to ship transfer operations based in US gulf. TIMELAPSE collection

Ships Montly - January 2024

Portugal contracts Damen to build Multi-functional Naval Platform

Portugal’s National Defence Ministry has contracted Damen Shipyards for the design and construction of a so-called Multi-functional Naval Platform. The €132 million multi-purpose vessel is...
Advertisement

Related articles

Portugal contracts Damen to build Multi-functional Naval Platform

Portugal’s National Defence Ministry has contracted Damen Shipyards for the design and construction of a so-called Multi-functional Naval...

NYK Stolt Tankers orders six chemical tankers

Stolt-Nielsen Limited has announced that its Joint Venture between NYK Line and Stolt Tankers (NYK Stolt Tankers, or...

LDA and Norsepower join forces in shipping Airbus aircraft components

LDA and Norsepower have joined forces in shipping large Airbus aircraft components, with a future fleet of low-emission...

Griffon Hoverwork awarded design and feasibility work by Canadian Coast Guard

The Canadian Coast Guard (CCG) has asked for engineering design consultancy services from Griffon Hoverwork to update their...