Advertisement

CABLE LAYER: Tyneside yard staying busy

A&P Group started work in July on the 1996-built cable layer European Supporter (9,227gt), owned by P&O Maritime Services Australia, a new client for the yard. The Tyne yard will be carrying out conversion work on the cable-laying vessel.

The 106m European Supporter is equipped to perform a wide variety of installation, cable-handling and burial tasks for the offshore renewables, telecommunications and oil and gas sectors. European Supporter can accommodate 5,000 tons of power cable in two static tanks, using a newly installed power cable-loading arm.

Part of the refit work included A&P manufacturing and installing a 7m abrasion-resistant steel chute, from which cables are lowered onto the seabed. Work also included a major overhaul of the generators.

Ships Montly - January 2024

Damen welcomes back tall ship Shabab Oman II

Damen has completed an extensive maintenance programme on the Royal Navy of Oman’s Sail Training Vessel Shabab Oman II. The work provides the Tall Ship...
Advertisement

Related articles

Damen welcomes back tall ship Shabab Oman II

Damen has completed an extensive maintenance programme on the Royal Navy of Oman’s Sail Training Vessel Shabab Oman...

Norsepower to Install Rotor Sails on Six GEFO Newbuild Tankers

In late May 2025 Norsepower, a global leader in wind propulsion, has secured a new agreement to deliver...

Samskip launches new Blyth route

Samskip is enhancing its UK trade strategy with a new direct connection offering multimodal options for northeast England Samskip...

Award for cross-channel ferry favourite Barfleur

A favourite cross-channel ferry has received a special award in recognition of its long service. Brittany Ferries' ro-pax...